Gallery
![]() |
Flag case I made. |
![]() |
Refinished floor and baseboards. |
![]() |
Painted walls, ceiling, and trim. |
![]() |
Built cellar door and painted/ |
![]() |
Repaired half wall and painted. |
![]() |
Repainted the top brown and the wall tan, resealed window trim and filled in cracks. |
![]() |
Replaced section of drywall between sink and tub. |
![]() |
Replaced trim around garage doors and painted. |
![]() |
Installed crown molding. |
![]() |
Installed back splash, cabinet above microwave, 2 outlets, the microwave, and the exhaust vent. |
![]() |
Installed crown molding. |
![]() | |
|
![]() |
Side view. Replaced from left side of pole to outside. Joist, floor boards, spindles, and railings. |
![]() |
Back Deck. Re-stained, repaired, pressure washed, 3 GFCI outlets installed, and gate to the right built and installed. |
![]() |
Before Picture. |
![]() |
Before Picture |
![]() |
Full view of finished back deck. |
![]() |
Built gate for back deck. |
![]() |
Back Deck lattice. Stained and replaced railing. |
![]() |
Laminate flooring installed. Before trim was reinstalled. |
![]() |
1st bedroom |
![]() |
2nd bedroom |
![]() |
Living room |
![]() |
After trim was installed. |
![]() |
1st bedroom |
![]() |
Marble subway tile, in Fox Lake Illinois. |
![]() |
And Fox Lake Illinois, we installed White marble tile for a back splash. Job took me two days to complete with some minor complications.Shed Repair |
![]() |
Before |
![]() |
Inside the shed you can see the rotten rooftop.
![]() |
(After) Replaced fascia and soft boards and extended overhang 6 inches. |
![]() |
(After) from view of shed repair. |
![]() |
(After) New shingles installed. |
No comments:
Post a Comment
Whats on your mind?