Friday, October 11, 2019

Masonry Work

Building A Concrete Step

Poured top new concrete step. Provided retaining wall for rain water.
New top step installation.




Poured top new concrete step. Provided retaining wall for rain water.
New step made to act as a re-
 wall. Gives rain water a 
chance to enter the drain.






Poured top new concrete step. Provided retaining wall for rain water.
A side view of the step.
We put anchors 42" in 
for a good sturdy foundation. 







Porcelain tile repair. This repair was  made due to a subpump repair that was needed.
We also did some tile 
repair work. I will 
show you some before 
pictures below. In these
pictures there is still
haze on the tile, this
was removed before we 
were done.







Porcelain tile repair. This repair was  made due to a subpump repair that was needed.
Here is a 2nd picture of the
porcelain tile. This repair was
made due to a subpump repair 
that was needed.





Before picture of tile work.
Before Picture of the tile
work. The cement and tile had
to be ripped up to access the
pipes.


Before picture of staircase.
This is a picture before
we added the new step.







No comments:

Post a Comment

Whats on your mind?