Building A Concrete Step
![]() |
New top step installation. |
![]() |
New step made to act as a re-
wall. Gives rain water a
chance to enter the drain.
|
![]() |
A side view of the step.
We put anchors 42" in
for a good sturdy foundation.
|
![]() |
We also did some tile
repair work. I will
show you some before
pictures below. In these
pictures there is still
haze on the tile, this
was removed before we
were done.
|
![]() |
Here is a 2nd picture of the
porcelain tile. This repair was
made due to a subpump repair
that was needed.
|
![]() |
Before Picture of the tile
work. The cement and tile had
to be ripped up to access the
pipes.
|
![]() |
This is a picture before
we added the new step.
|