Deck Refinishing 9/8/2019



🔼Deck Refinishing🔼

Job List

  • Removed patio furniture.
  • Pressure Wash 2 times.
  • Replaced rotten wood.
  • Stripped, scrapped, and sanded deck paint stain away from wood.
  • Sanded some more!
  • Rebuilt entrance gate.
  • Started applying the first of 3 coats of Pittsburgh Paints & Stains®  Redwood stain from Menards.
  • Replaced the patio furniture.
Total time taken 60 hours.


Materials Needed

  1. Deck Cleaner.
  2. Sandpaper/ belts and pads.
  3. Brushes/Roller/Staining Pads.
  4. GripFast Deck Screws. (2 Boxes)
  5. Specialty Screws. (For remounting weather equipment).
  6. Gate Hardware: 2 latches and 2 hinges. ( 1 latch for the backside of the gate to keep open.
  7. Wood Repair Kit. (2 part epoxy)
  8. Pittsburgh Redwood Semi- Transparent Deck Stain (7 gallons).
  9. Misc. Item's; tape, rages, drop cloths.
  10. Cedar Lumber;

  • 4- 1x8x6'
  • 5- 2x2x42"
  • 2- 2x4x8'
  • 1- 2x4x6'
  • 1- 2x8x4'

Added Work

  1. Installed Flagstone Pathway
  2. Weeded Garden
  3. Plant 1 Tree and Replant 1 Tree
  4. Pond Maintenance
    • Total Hours= 80
    • Total Cost (Including Supplies)= $3,595.00