🔼Deck Refinishing🔼
Job List
- Removed patio furniture.
- Pressure Wash 2 times.
- Replaced rotten wood.
- Stripped, scrapped, and sanded deck paint
& stain away from wood.
- Sanded some more!
- Rebuilt entrance gate.
- Started applying the first of 3 coats of Pittsburgh Paints & Stains® Redwood stain from Menards.
- Replaced the patio furniture.
Total time taken 60 hours.
Materials Needed
- Deck Cleaner.
- Sandpaper/ belts and pads.
- Brushes/Roller/Staining Pads.
- GripFast Deck Screws. (2 Boxes)
- Specialty Screws. (For remounting weather equipment).
- Gate Hardware: 2 latches and 2 hinges. ( 1 latch for the backside of the gate to keep open.
- Wood Repair Kit
. (2 part epoxy)
- Pittsburgh Redwood Semi- Transparent Deck Stain (7 gallons).
- Misc. Item's; tape, rages, drop cloths.
- Cedar Lumber;
- 4- 1x8x6'
- 5- 2x2x42"
- 2- 2x4x8'
- 1- 2x4x6'
- 1- 2x8x4'
Added Work
- Installed Flagstone Pathway
- Weeded Garden
- Plant 1 Tree and Replant 1 Tree
- Pond Maintenance
- Total Hours= 80
- Total Cost (Including Supplies)= $3,595.00