Friday, May 31, 2019

Marble Subway Tile Installation

Marble Subway Tile Installation


Finished back splash!



Back splash before the grout.




Back splash in progress.


For some reason this took me 2 day to complete.  There were little things that I would go like to touch up, but they had some plans so time was limited, and I can relate. This job took a bit longer than I had anticipated but I was satisfied with the final results, though I would have preferred a little longer to touch up a few little things.  If it wasn't for feeling rushed, this could of been my best.

No comments:

Post a Comment

Whats on your mind?